"AHHAC delivered our 22-zone underfloor system on time, on budget and to spec. The crew were tidy, the documentation was thorough, and the commissioning was textbook."

For Brisbane's short winters and long, humid summers, a reversible hydronic heat pump is the smart choice: gentle radiant warmth on cool mornings and silent chilled-water cooling right through summer, from a single all-electric unit. Designed and installed across South-East Queensland from our Banyo showroom.

ImmergasSimeThermaSkirt™Brisbane doesn't need much heating — roughly 500–650 heating-degree-days a year — but it needs a lot of cooling. That's exactly why a reversible hydronic heat pump makes so much sense here: the same Italian-engineered Maxa unit that takes the chill off a July morning reverses in summer to pump chilled water through your underfloor loops or fan coils, giving silent, even, dust-free cooling for months on end. One piece of plant, all-electric, and ready to run on rooftop solar.
AHHAC designs and installs heat-pump hydronic systems across Greater Brisbane, the Gold Coast, the Sunshine Coast and the northern-NSW border towns from our Banyo showroom. For the wider service picture see our Brisbane hydronic heating page, and to understand where hydronic beats blown air read our ducted vs hydronic heating comparison.
A Maxa i-290 (R290) or i-32V5 (R32) runs as a heat pump in winter and a water chiller in summer. In Brisbane's climate the cooling duty dominates, and hydronic cooling has real advantages over ducted air-conditioning — no draughts, no blown dust or allergens, near-silent operation and 25–40% lower running cost because water moves heat far more efficiently than air. Pair it with rooftop solar and daytime cooling runs close to free. Read more on the physics of radiant comfort in our guide to the cooling potential of radiant floor systems.
The one thing that must be engineered correctly for hydronic cooling in Brisbane is humidity. We size a small fan-coil dehumidification stage and fit dew-point sensors that automatically lift the chilled-water temperature if the air gets too humid — so floors and pipework never sweat. This is the detail cheap installs get wrong; see the pitfalls in our guide to mistakes to avoid. Every AHHAC Brisbane job starts with a heat-loss and cooling-load calculation, not a rule of thumb.
Last updated 24 July 2026 · AHHAC
"AHHAC delivered our 22-zone underfloor system on time, on budget and to spec. The crew were tidy, the documentation was thorough, and the commissioning was textbook."
"We've worked with AHHAC for 17 years. They've installed and serviced our hot water plant across three commercial buildings — and they pick up the phone on weekends."
"Three mobs quoted us; AHHAC's design was the only one based on a proper heat-loss calculation. The system runs beautifully — the others would've been oversized and expensive."